VRE 3/23:
Crystal City Station ImprovementsThe public is invited to a community meeting for the VRE Crystal City Station Improvements project.
WHEN: Thursday, March 30, 2017 at 5:00 to 7:30 PM (Presentation at 5:30 PM)WHERE: 2011 Crystal Drive 11th Floor, Arlington, VA 22202Come and learn more about the project and provide comments on the Proposed Options for station location, and the Evaluation Factors that should be considered to identify a Preferred Alternative.Download the presentation HERE.Optionally, drop by the Crystal City Station to discuss the project with VRE Staff on Wednesday, March 29, 2017, 3:00 – 6:30 PMSend written comments by April 10, 2017 via email to: ssoneji@vre.orgOr via mail Attention: Sonali Soneji, Project ManagerVirginia Railway Express, 1500 King St. Suite 202, Alexandria VA 22314
PROJECT DESCRIPTION
The VRE Crystal City station is one of the busiest in the system and is the destination for about 18% of VRE riders. However, the existing platform is only 400 feet long and serves one track. VRE trains currently have up to eight cars which require a 700-foot platform. A reconfigured station with a longer platform served by two tracks would remove an operational bottleneck and expand train capacity in the most heavily trafficked part of the CSXT RF&P Subdivision. It will also improve the safety and reliability of the railroad.
A new island platform with two platform edges will be designed in the vicinity of the existing VRE Crystal City station. Conceptual plans will be coordinated with a future fourth track currently under design by the Virginia Department of Rail and Public Transportation's DC to Richmond VA (DC2RVA) project. Two grade-separated access points will be provided between the platform and Crystal Drive. The project will also enhance local and regional connectivity by optimizing multimodal access, especially to Metrorail, Crystal City-Potomac Yard Transitway, local buses and shuttles, taxi stand or kiss-and-ride areas, and bicycle and pedestrian facilities.
The current phase of the project will:
- Identify key factors related to the location and design of the improved station through stakeholder and public outreach;
- Select a location for an improved VRE Crystal City station platform based on the railroad geometry and accessibility to Crystal City area destinations;
- Identify a preferred alternative station configuration to advance into preliminary engineering; and
- Identify key environmental issues that will need to be addressed in the next phase of project development
PROJECT SCHEDULE
Proposed Timeline for Current Study
Funding is being sought for future phases of the project.