Posted 16 September 2015 - 11:37 AM

<p>NY MTA</p>

New York’s Metropolitan Transportation Authority (MTA) opened the new 34 St-Hudson Yards 7 Subway Line Station, a modern marvel with 21st Century amenities that introduces subway service to the far West Side of midtown Manhattan, fostering transit-oriented development in the emerging, mixed-use community there.

The $2.42 billion, 1.5-mile extension of the 7 Subway Line Icon Line to 34 St-11 Av was funded by the City of New York. City funding included $2.1 billion for the station in addition to $266 million for other non-subway related infrastructure work. The MTA contributed $53 million for the extension, helping spur the development and transformation of the rezoned far West Side. It is the first new station added to the subway system since MTA New York City Transit opened the Lexington Av-63 St, Roosevelt Island, and 21 St-Queensbridge stations in 1989.

<p>NY MTA</p>

MTA Chairman and CEO Thomas F. Prendergast was joined by Mayor Bill de Blasio, MTA Capital Construction President Dr. Michael Horodniceanu, New York City Transit Interim President James L. Ferrara and other elected officials and stakeholders to cut the ribbon marking the opening of the 34 St-Hudson Yards 7 Subway Line Icon Station. The station is expected to serve more than 32,000 entries and exits on weekdays when it opens and is designed to handle as many as 25,000 during a peak hour.

“This station is the centerpiece of an ambitious plan to make the far West Side of Manhattan a top-tier destination for residents and visitors alike while meeting the daily needs of millions of subway riders, and one that is poised to meet future needs,” Gov. Andrew M. Cuomo said. “It is a clear example of how the City and State can work together to support a transit network that drives our regional economy.”

Station Amenities

The station and the new subway line contain state-of-the-art mechanical, electrical and communications equipment and systems. Highly functional public spaces provide capacity for future system changes, integrating signage, lighting, digital advertising and artwork. The new 34 St-Hudson Yards 7 Subway Line Station contains other notable “firsts” for the New York City Transit subway system including the longest column-free station platform and the longest escalators inside any station.

The station is also the first to comply with ADA requirements with two inclined elevators between the upper and lower mezzanines. The elevators travel 82 feet vertically and 152 feet horizontally at the speed of 100 feet per minute. They can accommodate five wheelchairs or 15 standing customers.

<p>NY MTA</p>

The 34 St-Hudson Yards 7 Subway Line Station has three public floors — the upper mezzanine (27.6 feet below street level), the lower mezzanine (109 feet below street level) and the platform level (125 feet below street level). Access from the street level to the upper mezzanine at the main entrance is provided by four low-rise escalators and two staircases. An ADA elevator located in the new park outside of the main entrance provides access to the upper mezzanine. From the upper mezzanine, customers will access the lower mezzanine using five high-rise escalators and the two inclined elevators. Eight sets of stairs and one ADA elevator provide access from the lower mezzanine to the platform level.

Among the station’s modern amenities, the platform level is air-tempered, maintaining a year-round temperature between 72 and 78 degrees Fahrenheit.

The station also features 12 Help Point Intercoms that allow customers to communicate with the station agent or the Rail Control Center in the case of an emergency. The station is adorned with 24 55-inch digital screens on the lower mezzanine that will show advertising and service notices from New York City Transit.

Eight On-the-Go screens and cell phone connectivity and Wi-Fi will be added in the near future, all of which will provide a new level of service and communications for customers. Countdown clocks will come to the station upon completion of the installation of Communications-Based Train Control slated for 2017.

The entire 34 St-Hudson Yards 7 Subway Line Icon Station features high-end finishes such as stainless steel tile wall panels, painted steel ceiling panels, granite floor tile, energy efficient lighting and other architectural features.

Keywords

7 Subway Line Station   Mayor Bill DeBlasio   NY MTA   opening   Thomas F. Prendergast   

 

Follow @lctmag on Twitter


View the full article

#22 KevinKorell

KevinKorell

    Board Leader

  • Sr. Admin
  • PipPip
  • 82319 posts
  • Gender:Male
  • Location:Lakewood, NJ
  • Interests:Making America TRAIN again!

Posted 18 September 2015 - 11:46 AM

Second Avenue Sagas, 9/17/15:

 


Doctoroff: Actually, now let’s build that 41st St. 7 train station

 

As Mayor Bill de Blasio and a pair of surrogates for Gov. Andrew Cuomo engaged in political sniping over the MTA’s capital plan during Sunday’s opening of the 7 line extension, a few feet away and well out of the fray sat former NYC Deputy Mayor Dan Doctoroff. The one-time Bloomberg side man could bask in the belated success.

Continue



Kevin Korell


OTOL Board Leader


Lakewood, NJ


#23 KevinKorell

KevinKorell

    Board Leader

  • Sr. Admin
  • PipPip
  • 82319 posts
  • Gender:Male
  • Location:Lakewood, NJ
  • Interests:Making America TRAIN again!

Posted 04 November 2015 - 09:10 PM

AM New York, 10/26/15:

 


Fewer than 6,000 riders daily are using new $2.4 billion subway station

 

No wonder it's so clean.

 

Fewer than 6,000 riders a day are using the new $2.4 billion 34th Street-Hudson Yard station on the No. 7 line, officials said Monday. The MTA had projected that as many as 32,000 people daily would use the serene far West Side station, which opened in September.

 

Update



Kevin Korell


OTOL Board Leader


Lakewood, NJ


#24 LouP

LouP

    Member

  • Members
  • PipPip
  • 61 posts
  • Gender:Male

Posted 05 November 2015 - 05:40 AM

It will probably pick up after all the new construction is finished.