Jump to content


Photo

ETS/Valley Line SE starts 11/4/23


  • Please log in to reply
14 replies to this topic

#11 CNJRoss

CNJRoss

    Administrator

  • Admin
  • PipPip
  • 43479 posts
  • Gender:Male
  • Location:Fairfax, VA

Posted 15 August 2022 - 02:59 PM

Railway Track & Structures, 8/12/22

 

Cracks in piers delay opening of Edmonton light rail line

 

 

TransEd, the agency charged with providing new LRT in Edmonton, Alberta, announced a delay in its Valley LIne Southeast LRT service commencement.

 

Work on this LRT line has been underway since 2016, and service was expected to begin this summer. However, according to TransEd CEO Ronald Joncas, recent city and TransEd inspections revealed cracks in some of the piers supporting the elevated tracks. Engineering investigations are underway now, and preliminary findings point to the need to strengthen some of the piers. No further details around what caused the cracks were provided, and a new opening date has not been set.

 

 

Continue here



#12 KevinKorell

KevinKorell

    Board Leader

  • Sr. Admin
  • PipPip
  • 82502 posts
  • Gender:Male
  • Location:Lakewood, NJ
  • Interests:Making America TRAIN again!

Posted 26 June 2023 - 04:58 PM

CTV,  6/26/23:

 


 

   'Sounds like another delay': TransEd to replace cables on Valley Line Southeast LRT    

 

 

TransEd, the company responsible for building and operating the Valley Line Southeast LRT, says cables need to be replaced before the line opens.

 

Full story



Kevin Korell


OTOL Board Leader


Lakewood, NJ


#13 KevinKorell

KevinKorell

    Board Leader

  • Sr. Admin
  • PipPip
  • 82502 posts
  • Gender:Male
  • Location:Lakewood, NJ
  • Interests:Making America TRAIN again!

Posted 09 September 2023 - 09:48 AM

News release,  9/7/23:

 


 

 

    September 7, 2023: NEWS RELEASE  

 

  Valley Line Southeast LRT – Update – Performance Demonstration Testing and Service Commencement 

 

 

TransEd, the company responsible for the design, build, operations and maintenance of the Edmonton Valley Line Southeast LRT, is pleased to provide an update on the project. 

 

As previously announced, testing identified cables that needed to be replaced to improve long-ter­­m system reliability. Today, we are pleased to announce cable replacement is complete, and line-wide train testing has resumed. “Replacement of the cables over the past nine weeks ensures the system will operate safely and reliably over the next 30 years,” says Dallas Lindskoog, TransEd spokesperson.

 

Concurrent with this upgrade, TransEd has continued to finalize and submit the required documentation for review by the independent certifiers who need to sign off on the system before the line can open for passenger service. In the next few weeks, trains will operate along the entire 13km, mimicking regular passenger service to demonstrate to the certifiers and the City that the Valley Line Southeast LRT is ready to open. We continue to work closely with the City, and more information about the opening date this fall will be provided as final testing and independent certification nears completion.

 

As the Valley Line Southeast is a low-floor, urban-style mode of transit, it will not use warning bells and crossing gates, and trains will behave differently at intersections than the current LRT. This means Edmontonians should be vigilant and carefully follow all traffic rules and signage around the new line. More information on public safety around the Valley Line can be found at transedlrt.ca and edmonton.ca/projects_plans/transit/pedestrian-and-traffic.



Kevin Korell


OTOL Board Leader


Lakewood, NJ


#14 KevinKorell

KevinKorell

    Board Leader

  • Sr. Admin
  • PipPip
  • 82502 posts
  • Gender:Male
  • Location:Lakewood, NJ
  • Interests:Making America TRAIN again!

Posted 27 October 2023 - 10:40 AM

Railway News, 10/27/23:
 


 

    Opening Date Announced for Edmonton’s Valley Line Southeast   

 

 

Edmonton’s Valley Line Southeast light rail transit (LRT) will open for passenger service on Saturday, 4 November, having been certified by professional engineers, a safety auditor and an independent professionally-qualified certifier.

 

Here is the story.



Kevin Korell


OTOL Board Leader


Lakewood, NJ


#15 KevinKorell

KevinKorell

    Board Leader

  • Sr. Admin
  • PipPip
  • 82502 posts
  • Gender:Male
  • Location:Lakewood, NJ
  • Interests:Making America TRAIN again!

Posted 03 November 2023 - 01:45 PM

CBC, 11/3/23:

 


 

   We ride at dawn: Much-delayed Valley Line Southeast LRT set to start running    

 

 

Nearly three years behind schedule, trains loaded with commuters will soon be screeching along the tracks of Edmonton's Valley Line Southeast LRT.

 

Here is the latest.



Kevin Korell


OTOL Board Leader


Lakewood, NJ





1 user(s) are reading this topic

0 members, 1 guests, 0 anonymous users