New, full-train-length, high-level platforms on both sides of the tracks will be constructed to replace the existing platform, allowing level boarding access. An enclosed overhead walkway served by stairs and elevators will be constructed over the tracks connecting the two platforms.
http://www.boston.co...B7YJ/story.html